The GMK5250XL-1 and GMK5150L-1 feature winterized cabs, snow protection, extended reach, and LED lighting, ensuring safe, year-round lifting in Iceland’s harsh conditions.
In April 2024, the site welcomed nine new SENNEBOGEN 830 E material handlers, purpose-built for high-volume timber operations and equipped to thrive under pressure.
Four EC-H tower cranes lift steel and concrete for the Ytre Steinsund Bridge, using robust technology, flexible foundations, and precise Litronic controls in harsh fjord conditions.
At Pittini Group’s Ferriere Nord steelworks, the customized 850 G processes 600 tons daily, shortens wagon unloading times, and integrates seamlessly with Industry 4.0 telematics systems.
Manitowoc’s Potain cranes, equipped with Top Tracing 3 and Potain CONNECT, achieve heights up to 168.8 m while ensuring safe, efficient operations on A2A’s sustainable skyscraper.
Hywel Griffiths Plant Hire deploys a reinforced CASE CX210E-S with Steelwrist tilt-rotator, Topcon guidance, and wider tracks for precision groundworks.