Join the 155,000+ IMP followers

Konecranes News

Bahamas port goes electric with Konecranes Gottwald Generation 6 Mobile Harbor Crane

Arawak Port Development Limited (APD) has ordered a Konecranes Gottwald ESP.6 mobile harbor crane to add substantial extra capacity to their terminal at the Port of Nassau. This crane will be the first at the port to run on mains power, which means zero emissions during operation. The crane was ordered in Q1 2024 and will be delivered in Q3 2024.

Join the 155,000+ IMP followers