Max Bögl uses Liebherr’s most powerful drilling rig to install 1,400 deep bored piles up to 50 meters, ensuring stability for Munich’s new U5 metro stations.
EAG-Berthold used the 117-ton, 36-meter-reach longfront excavator for controlled bridge demolition, ensuring precision, safety, and easy transport efficiency.
Simulating and validating weld reachability before production has helped Sandvik accelerate automation, minimize downtime and standardize multi-pass welding across assemblies.
The GMK5250XL-1 and GMK5150L-1 feature winterized cabs, snow protection, extended reach, and LED lighting, ensuring safe, year-round lifting in Iceland’s harsh conditions.
In April 2024, the site welcomed nine new SENNEBOGEN 830 E material handlers, purpose-built for high-volume timber operations and equipped to thrive under pressure.
Four EC-H tower cranes lift steel and concrete for the Ytre Steinsund Bridge, using robust technology, flexible foundations, and precise Litronic controls in harsh fjord conditions.
At Pittini Group’s Ferriere Nord steelworks, the customized 850 G processes 600 tons daily, shortens wagon unloading times, and integrates seamlessly with Industry 4.0 telematics systems.