Sennebogen enabled Schrott Wetzel to operate a fully emission-free scrap-handling site in Mannheim using an electric EQ Balancer with high process efficiency.
Max Bögl uses Liebherr’s most powerful drilling rig to install 1,400 deep bored piles up to 50 meters, ensuring stability for Munich’s new U5 metro stations.
EAG-Berthold used the 117-ton, 36-meter-reach longfront excavator for controlled bridge demolition, ensuring precision, safety, and easy transport efficiency.
Simulating and validating weld reachability before production has helped Sandvik accelerate automation, minimize downtime and standardize multi-pass welding across assemblies.
The GMK5250XL-1 and GMK5150L-1 feature winterized cabs, snow protection, extended reach, and LED lighting, ensuring safe, year-round lifting in Iceland’s harsh conditions.